I think ozblue is spot on with a CR in the offing, perhaps at the same time as the quarterly. The third in a series of rushed, half complete announcements promising much (as usual) but not delivering. Todays is typically disingenuous. Where are the 40mm nuggets, if the plant is re-commissioned? Why no photo of >40mm nuggets pouring into a truck off the end of a conveyer? Oh, wait a bit "fine tuning and small in-house modifications being implemented". So, it is neither complete, nor commissioned. When will the 40mm nuggets start flowing? No indication - not even "soon" in this announcement.
What does "The full range of operating parameters are being evaluated on a range of feed rock hardness" mean? It sounds impressive, but this is supposed to be a commissioned plant, and they should already know how it works for different hardnesses. That's surely part of the commissioning process.
How long has it continuously run at 550 or 500 tph? One hour, three 12hr shifts?
Good to see trucks being loaded. Anyone know why they would smooth out the top of the block of ore for EHM?
Add to My Watchlist
What is My Watchlist?