BPG 0.00% 0.9¢ byte power group limited

Ann: Cryptocurrency Exchange update, page-13

  1. 4,223 Posts.
    lightbulb Created with Sketch. 1212
    They are in system testing. So the IT project life cycle means that the next steps are: user acceptance testing, then code changes to fix errors and bugs, then regression testing then delivery. Hopefully they have already done stress testing. And gone through change management so the business can actually run the back office properly.
    Q4 minimum I reckon.
 
watchlist Created with Sketch. Add BPG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.