This is going to be some work over!! 20% flowed at 1500 100% could flow hard and 5000-10000 shouldn’t surprise. I wouldn’t be surprised if the acid goes down the hole as early as Jan 1 either. They haven’t stopped working on site since last announcement
The production after a normal acid wash and workover treatment for a typical **Varadero oil well** (2000 m deep) depends on several factors, including the reservoir's characteristics, the initial production rates, the extent of formation damage, and the efficacy of the treatment. Here's a general outline:
### **What to Expect:**
1. **Initial Production Improvement:**
- An **acid wash** is used to remove scale, rust, and deposits in the wellbore, while a **workover** addresses mechanical and operational inefficiencies.
- If the formation near the wellbore is mildly damaged, production rates can **increase by 10–50%** compared to pre-treatment levels.
2. **Reservoir Characteristics:**
- **Carbonate reservoirs** respond well to acidizing, often resulting in significant production boosts.
- **Sandstone formations** may see more moderate improvements, especially if fines migration or paraffin buildup caused the damage.
3. **Restoration Potential:**
- For wells that experienced a **gradual decline** due to scaling or clogging, these treatments can often restore production to **near-original rates** temporarily.
4. **Duration of Improvement:**
- Production improvements from acidizing and workovers typically last for **6 months to 2 years**, depending on reservoir pressure, fluid compatibility, and flow rates.
### **Specific Estimates for Varadero Wells:**
- In **Varadero fields**, production rates may vary from **100 to 800 barrels of oil per day (BOPD)** depending on reservoir pressure and porosity.
- After treatment, an increase of **20–30% in production** is a reasonable expectation for typical wells, assuming no severe underlying issues like water breakthrough or depletion.
### **Challenges and Risks:**
- **Potential Over-Acidization:** If acid reaches unwanted zones (e.g., water zones), it may cause water coning.
- **Reservoir Damage Beyond Acid Wash Scope:** In some cases, additional treatments like hydraulic fracturing or advanced stimulation techniques might be required.
Would you like further insights on optimizing these treatments or understanding the costs and risks associated?
- Forums
- ASX - By Stock
- MAY
- Ann: Cuba Block 9 Update
MAY
melbana energy limited
Add to My Watchlist
0.00%
!
2.4¢

Ann: Cuba Block 9 Update, page-135
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
2.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $80.88M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.4¢ | $24.60K | 1.023M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 383074 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 2030293 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 383074 | 0.024 |
5 | 704998 | 0.023 |
4 | 681000 | 0.022 |
4 | 847807 | 0.021 |
6 | 1630998 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 2030293 | 12 |
0.026 | 3091657 | 11 |
0.027 | 285540 | 3 |
0.028 | 200000 | 2 |
0.029 | 666666 | 2 |
Last trade - 16.10pm 16/06/2025 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |