re: Ann: Cudeco regains 100% control of Multi...
I think you would have to differentiate between potable water for drinking and process water for the plant
Potential scenario (subject to the hydrogeology - and we don't know as this would be in the PFS/BFS which have not been released) would be for the water produced from dewatering the pit to be used as process water from the plant (and this water would be recycled) with additional top ups from a bore field if required.
As for potable water - well that can be easily solved, depending on the quality of the bore water.
CDU Price at posting:
$1.45 Sentiment: None Disclosure: Not Held