Not impressed with the FPSO operator whose equipment failure with the topside has caused problems with hydrates in the wells resulting in the blockages and KAR having to arrange at it's expense an intervention program currently estimated to cost us 5 to 10mm USD which will probably blow out.
- Forums
- ASX - By Stock
- KAR
- Ann: CY24 production update and revised guidance
Ann: CY24 production update and revised guidance, page-22
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
|
|||||
Last
$1.80 |
Change
0.035(1.98%) |
Mkt cap ! $1.442B |
Open | High | Low | Value | Volume |
$1.79 | $1.83 | $1.78 | $12.59M | 6.979M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 41814 | $1.80 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.80 | 46131 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 41814 | 1.795 |
9 | 96725 | 1.790 |
7 | 99006 | 1.785 |
4 | 16090 | 1.780 |
3 | 62323 | 1.775 |
Price($) | Vol. | No. |
---|---|---|
1.805 | 5782 | 1 |
1.810 | 31930 | 3 |
1.815 | 52283 | 4 |
1.820 | 86497 | 6 |
1.825 | 21191 | 3 |
Last trade - 16.10pm 26/06/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |