Not impressed with the FPSO operator whose equipment failure with the topside has caused problems with hydrates in the wells resulting in the blockages and KAR having to arrange at it's expense an intervention program currently estimated to cost us 5 to 10mm USD which will probably blow out.
- Forums
- ASX - By Stock
- Ann: CY24 production update and revised guidance
Not impressed with the FPSO operator whose equipment failure...
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.89 |
Change
0.000(0.00%) |
Mkt cap ! $1.514B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1842 | $2.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.80 | 23560 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1842 | 2.070 |
1 | 400 | 1.985 |
4 | 4744 | 1.970 |
2 | 3888 | 1.955 |
5 | 28076 | 1.950 |
Price($) | Vol. | No. |
---|---|---|
1.800 | 11965 | 5 |
1.820 | 16286 | 1 |
1.825 | 13651 | 1 |
1.855 | 50 | 2 |
1.860 | 3600 | 1 |
Last trade - 09.58am 09/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.91 |
  |
Change
0.000 ( 1.22 %) |
|||
Open | High | Low | Volume | ||
$1.91 | $1.93 | $1.91 | 93511 | ||
Last updated 10.17am 09/05/2024 ? |
Featured News
KAR (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online