POW 0.00% 0.8¢ protean energy limited

Ann: Daejon Extraction License Application Submitted, page-7

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 11,379 Posts.
    lightbulb Created with Sketch. 1936
    How much cash would they really need, remembering it is a 50/50 joint venture so POW only needs to come up with half the cash?

    Looking at the mine study update it appears that access to the East mine would be drilled horizontally from near the base of the quarry for just 200 metres to access the resources. The immediate plan appears to be for excavating about 1km (East and West mines) of the 8.3km strike length.

    I'd be interested to know what the lead time would be before the commencement of processing of the vanadium. They'd have to put in place infrastructure such as the tailings dam, power access, ventilation shaft, etc.

    They already have access to processing so do not need a processing plant immediately, although that is only for low volumes.
 
watchlist Created with Sketch. Add POW (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.