regarding development cost are there two main parts to the development cost apart from capex for processing ) being the cost of the decline and the other development cost of developing the levels .
Maybe have a look at the mine plan map for NN where the decline goes closely past all the ore bodies pepper , West Winds and then look at the current number of declines BGL has and the disassociated lodes , to me it seems SPR has a clear advantage here
Still yes as you infer and as an amateur I would agree , maybe developing at up to two levels below where they are stoping out (to keep development ahead of mining ) will mean there is considerable development cost for developing the levels , before mining begins .
Couple that with the long strike lengths per level for NN , that although great once established as give a high OVM (coupled with thickness of the ore body and high grade) also means if retreat mining long hole stoping , and back filling , the total length of drive has to be developed before being mined out which will cost more than a shorter strike lengthed ore body .
Maybe one advantage is they could access the drives at a point between Pepper and NN and run them out from there so just one side is developed initially ?
IE first mine NN and then come back and mine PP from the same access point from the decline ?
- Forums
- ASX - By Stock
- Ann: Dalgaranga Gold Project - Mineral Resource Estimate Update
regarding development cost are there two main parts to the...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
|
|||||
Last
$1.28 |
Change
-0.005(0.39%) |
Mkt cap ! $1.411B |
Open | High | Low | Value | Volume |
$1.28 | $1.28 | $1.27 | $5.145M | 4.035M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 39096 | $1.27 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.28 | 275738 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 39096 | 1.265 |
5 | 61348 | 1.260 |
2 | 37195 | 1.255 |
15 | 152472 | 1.250 |
3 | 42762 | 1.245 |
Price($) | Vol. | No. |
---|---|---|
1.280 | 275738 | 6 |
1.285 | 117700 | 3 |
1.290 | 155000 | 4 |
1.300 | 162564 | 4 |
1.305 | 40272 | 2 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
SPR (ASX) Chart |