    The cost issue does not suddenly appear - it would have been an issue for months and gradually became more concrete over time ie so maybe they recognised that costs were likely to be higher say back in March but needed more production and also analysis to get a better handle on how much higher it was going to be.

    One needs to ask why the feasibility studies produced such low costs - there must have been some big mistakes as labour costs have not increased by 75% in 2 years nor have other costs. Those studies look like they were not worth the paper they were written on.
 
watchlist Created with Sketch. Add SPR (ASX) to my watchlist
(20min delay)
Last
$1.28
Change
-0.005(0.39%)
Mkt cap ! $1.411B
Open High Low Value Volume
$1.28 $1.28 $1.27 $5.145M 4.035M

Buyers (Bids)

No. Vol. Price($)
4 39096 $1.27
 

Sellers (Offers)

Price($) Vol. No.
$1.28 275738 6
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
SPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.