Ann: Davenport 1 Testing Update, page-2

  1. 5,347 Posts.
    lightbulb Created with Sketch. 2640
    “The fact that we have now seen consistent reservoir characteristics from testing programs at wells
    in both PEL 94 and PEL 96 is very encouraging. The extensive nature of these high deliverability coals
    underpins the potential of this part of the Cooper Basin to deliver a major new gas resource.”

    Completion, flow back and testing operations at Davenport 1 commenced on 2 August 2014. A
    Patchawarra Vu coal zone was perforated and a small fracture stimulation treatment pumped. Coil
    tubing operations, including nitrogen pumping, were then undertaken to clean the wellbore and to
    artificially lift fluid out of the well. Encouraging hydrocarbon shows were observed via gas detector
    at surface throughout the duration of the nitrogen lift operations and an estimated 90% of the frac
    fluid was recovered during the flow back period.
    A plug was then set and the Patchawarra Vm3 coal perforated. Based on the analysis of the data
    from the lower zone, the joint venture decided to proceed with flow testing of this zone without
    fracture stimulation using coiled tubing and nitrogen lift. Encouraging hydrocarbon shows were
    again observed at surface throughout the duration of the nitrogen lift operation.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
20.3¢
Change
0.003(1.25%)
Mkt cap ! $579.3M
Open High Low Value Volume
20.5¢ 20.8¢ 20.0¢ $646.0K 3.161M

Buyers (Bids)

No. Vol. Price($)
114 4174324 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 857446 90
View Market Depth
Last trade - 15.29pm 22/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.