because if he announced the net pay for the free gas zone was less than a meter and came out to announce 156m net zone for the other rubbish resource which the 0.39TCF is spread over 156m so needs dozens of well to even have access to this gas which Is uneconomically viable the SP would have been crunched. But his playing this the smart way but in the end the SP will still be smashed in the weeks ahead
- Forums
- ASX - By Stock
- Ann: Daydream-2 logs 154 metres net pay
because if he announced the net pay for the free gas zone was...
-
- There are more pages in this discussion • 92 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.4M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.0¢ | $254.5K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 106270 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 0.165 |
9 | 281589 | 0.160 |
5 | 279814 | 0.155 |
13 | 554770 | 0.150 |
7 | 539692 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 106270 | 7 |
0.175 | 353986 | 7 |
0.180 | 790855 | 14 |
0.185 | 68701 | 3 |
0.190 | 199892 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
EXR (ASX) Chart |