They do, but this operation will change things. The 2C is 1.3TCF but that is only for the tight sandstone play and does not include the fractured coals. We only have a prospective resource on these (2U = 3.6TCF). I am not sure if the Lorelle is included in the 2C or not. From the annual report.
- Forums
- ASX - By Stock
- EXR
- Ann: Daydream-2 Operations Update
Ann: Daydream-2 Operations Update, page-146
-
-
- There are more pages in this discussion • 115 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.4M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.0¢ | $254.5K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 106270 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 0.165 |
8 | 231589 | 0.160 |
4 | 241166 | 0.155 |
13 | 554770 | 0.150 |
7 | 539692 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 100388 | 6 |
0.175 | 353986 | 7 |
0.180 | 690855 | 13 |
0.185 | 68701 | 3 |
0.190 | 199892 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |