Great point. There could be the option for Condor to perf and frack another area in the Lorelle sands, install new string production pipe and flow again, with the possible result achieving over 3mscfpd.
Or, we get them to do this work on DD-3 in consultation with our JV partner who'll fund and have a significant input into well design.
- Forums
- ASX - By Stock
- EXR
- Ann: Daydream-2 Operations Update
Ann: Daydream-2 Operations Update, page-148
-
-
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.4M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.0¢ | $254.5K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 106270 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 0.165 |
8 | 231589 | 0.160 |
4 | 241166 | 0.155 |
13 | 554770 | 0.150 |
7 | 539692 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 100388 | 6 |
0.175 | 353986 | 7 |
0.180 | 690855 | 13 |
0.185 | 68701 | 3 |
0.190 | 199892 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |