EXR elixir energy limited

Ann: Daydream-2 Operations Update, page-34

  1. 895 Posts.
    lightbulb Created with Sketch. 401
    @BasVermeulen. I agree with what you are saying. but if the Lorelle has both higher permeability and is overpressured with respect to each the zones above, then would it not have been more operationally efficient to ensure there was a plug still in place which would have isolated both the Lorelle perfs and the troublesome leak zone perfs above that?

    Is it possible that a plug can be set on wireline rather than wait for the return of the CTU? Is there a coil hose nitrogen lift unit nearby which might be available to inject nitrogen provided it has the coil length to get deep enough? Just trying to find a way to speed up the process.

    If all of the sands and coals were on the same hydrostatic pressure gradient then flow from any one sand or coal interval would depend on its Kh and the drawdown. The additional consideration here is that the unconventional zones would never have cleaned up if they are competing against an overpressured Lorelle gas zone.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.7¢
Change
-0.001(3.57%)
Mkt cap ! $37.78M
Open High Low Value Volume
2.7¢ 2.8¢ 2.7¢ $34.53K 1.276M

Buyers (Bids)

No. Vol. Price($)
2 472236 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 257895 6
View Market Depth
Last trade - 16.10pm 24/06/2025 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.