PPK 0.00% 37.5¢ ppk group limited

Ann: Deakin ManuFutures Expansion Benefits Li-S Energy, page-70

  1. 1,598 Posts.
    lightbulb Created with Sketch. 155


    Actually doesn't mention Li-S or PPK maybe they just got out of handing any dosh over.
    Cutting-edge battery and hydrogen hubs to open at Deakin University

    By
    Jasmina
    -
    June 30, 2021


    Share






    The Victorian Government has unveiled a $34.9 million plan to create a world-first battery facility and a regional hydrogen hub at Deakin University’s Burwood and Warrnambool campuses.
    The two new infrastructure and research projects – BatTRI-HUB 2.0 and the Hycel Technology Hub – are expected to initially create around 200 direct jobs in construction, manufacturing and research, over the next four years.
    The Battery Technology Research and Innovation Hub 2.0 (BatTRI-HUB 2.0) will be a dedicated, world-class battery technology research and translation facility that specialises in advanced battery design, fabrication and testing.
    The new facility will feature a testing lab and pilot production line to research and manufacture advanced batteries using lithium and sodium, which will be developed to meet bespoke requirements in defence, agriculture, disaster zones and health settings.

    The funding will also help establish the nation’s first regional hydrogen hub in Warrnambool, called Hycel Technology Hub.
    The facility will specialise in the development, testing, training, demonstration and manufacture of hydrogen fuel technology, with a focus on transport and heavy vehicles, storage and industry applications.
    As part of the project, Deakin aims to transition its Warrnambool campus from gas to hydrogen and will convert the Warrnambool Bus Lines fleet to clean energy.
    The Victorian Government has invested $14.2 million in these projects, with Deakin University, the Commonwealth Government, and project partners including Warrnambool Bus Lines, PACCAR Kenworth, Boron Molecular, Future Fuels CRC, Calix+ and SensorPlex, to contribute a combined total of $20.7 million.
    Both facilities are expected to be up and running by late 2020.
 
watchlist Created with Sketch. Add PPK (ASX) to my watchlist
(20min delay)
Last
37.5¢
Change
0.000(0.00%)
Mkt cap ! $33.73M
Open High Low Value Volume
37.5¢ 37.5¢ 37.5¢ $242 646

Buyers (Bids)

No. Vol. Price($)
1 9354 37.5¢
 

Sellers (Offers)

Price($) Vol. No.
39.0¢ 6926 3
View Market Depth
Last trade - 10.06am 06/08/2024 (20 minute delay) ?
PPK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.