This is where an experienced team makes a difference to the bottom line.
Onwards and upwards.
The major change to the plant design from the 2018 study has been a move to a three stage crushing circuit and a single ball mill (previous design was single stage crushing feeding SAG and ball mills). This revised configuration is designed to achieve a throughput in the order of 3.5 – 4.0mtpa in fresh ore (previous design forecast 3.0mtpa). This is expected to deliver an average gold production range of 105,000 – 120,000 ounces per annum, representing significant upside to the average life of mine production estimate of 100,000 ounces per annum reported in the 2018 study.
Imo, dyor no advice.
- Forums
- ASX - By Stock
- Ann: Debt Financing Completed & Project Update
CMM
capricorn metals ltd
Add to My Watchlist
1.75%
!
$8.97

This is where an experienced team makes a difference to the...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$8.97 |
Change
-0.160(1.75%) |
Mkt cap ! $3.867B |
Open | High | Low | Value | Volume |
$9.04 | $9.04 | $8.83 | $13.01M | 1.455M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 10525 | $8.90 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$8.99 | 1011 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 10525 | 8.900 |
2 | 3450 | 8.890 |
3 | 6047 | 8.880 |
1 | 2197 | 8.870 |
1 | 1000 | 8.860 |
Price($) | Vol. | No. |
---|---|---|
8.990 | 1011 | 3 |
9.050 | 1300 | 2 |
9.100 | 4279 | 1 |
9.180 | 431 | 1 |
9.330 | 5000 | 1 |
Last trade - 16.10pm 31/07/2025 (20 minute delay) ? |
Featured News
CMM (ASX) Chart |