DSE 0.93% $3.27 dropsuite limited

This is very encouraging. Following the 2008 drilling programme,...

  1. 6,500 Posts.
    lightbulb Created with Sketch. 176
    This is very encouraging.

    Following the 2008 drilling programme, which increased gold resources at the Tennant Creek Project to more than 1.2Moz, the Excalibur Board appointed the Oyster Consulting Group to scope out some development alternatives. The preliminary draft presented a number of possible options that require further work
    before a decision can be made to commence full feasibility. The Oyster study includes commercially sensitive information which will be necessary for any
    negotiations with potential joint venture parties. The Excalibur Board will release its 2009 programme after full consideration of the results of these studies.
 
watchlist Created with Sketch. Add DSE (ASX) to my watchlist
(20min delay)
Last
$3.27
Change
0.030(0.93%)
Mkt cap ! $228.4M
Open High Low Value Volume
$3.24 $3.30 $3.23 $215.8K 65.97K

Buyers (Bids)

No. Vol. Price($)
1 2000 $3.24
 

Sellers (Offers)

Price($) Vol. No.
$3.43 5500 1
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
DSE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.