Things to do for the installation of Pilot Plant:
1. Construction permit from Local Author must be obtained.
2. Civil Engineering works for drainage and foundations of the plants must start .
3. Inform Jinpeng the civil engineering work schedule, so that they can apply Malaysian work permit visas for their Chinese technical team to come to site to supervise the installation work in BAU, Malaysia.
4. Still need to finalize the design and manufacture of the electrical control and system board once the installation works near completion.
5. As far as I was told, all these actions are being done in the back ground.
Looking forward for some progress report in Next month.
- Forums
- ASX - By Stock
- BEZ
- Ann: December 2023 Contract Note
Ann: December 2023 Contract Note, page-72
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BEZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.005(5.00%) |
Mkt cap ! $43.90M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 9.9¢ | $46.96K | 464.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 65000 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 641290 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 65000 | 0.100 |
1 | 200000 | 0.096 |
1 | 105263 | 0.095 |
2 | 11516 | 0.093 |
1 | 5376 | 0.091 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 206290 | 4 |
0.110 | 328283 | 4 |
0.115 | 216235 | 4 |
0.120 | 440800 | 3 |
0.125 | 234307 | 2 |
Last trade - 16.10pm 16/08/2024 (20 minute delay) ? |
Featured News
BEZ (ASX) Chart |