GOR 1.36% $1.82 gold road resources limited

Ann: December 2023 Quarter Production Update, page-26

  1. 11,132 Posts.
    lightbulb Created with Sketch. 684
    I think the market will be nervous until there is a new guidance given for CY24, and a full explanation. The midpoint for their previous target for CY24 and 25 was 350 koz with no cost guidance. Costs might be guided at, say, AISC 1900 to allow a margin of safety, if the worker shortage is not just expected to impact two quarters. GS had 343 koz at AISC 1672 after the Sep qly.

    If manpower stays a problem - then costs will be higher than previously expected. I calced AISC for the Dec q at about 1950, assuming 1655 for the full year.
 
watchlist Created with Sketch. Add GOR (ASX) to my watchlist
(20min delay)
Last
$1.82
Change
-0.025(1.36%)
Mkt cap ! $1.971B
Open High Low Value Volume
$1.82 $1.83 $1.78 $7.452M 4.120M

Buyers (Bids)

No. Vol. Price($)
2 22059 $1.82
 

Sellers (Offers)

Price($) Vol. No.
$1.83 18949 1
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
GOR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.