re: Ann: December Quarter Gold Production and... I did like: "...process cost/t was 15% below the budget.
Continued throughput increases are expected to reach an annualised rate of 4.5 million tonnes per annum in the March quarter."
Impressive new 250 tonne loader and 4x 100 tonne trucks, initially for Duckhead, should greatly help...