Deepwater HorizonMain articles: Deepwater Horizon explosion and Deepwater Horizon oil spillIn 2010, Schlumberger was contracted to perform wireline logging on the Deepwater Horizon oil rig in the Gulf of Mexico. On the day of the explosion, the Schlumberger crew was supposed to perform a cement evaluation test, but the test was cancelled and the crew was released by BP to leave the rig on the same day.[64][65] The cost-cutting decision to cancel the test is dramatized in the subsequent film by Peter Berg.
Interesting.
- Forums
- ASX - By Stock
- BAS
- Ann: Deep Coal Commercialisation Study Underway
Ann: Deep Coal Commercialisation Study Underway, page-16
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BAS (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
0.004(6.25%) |
Mkt cap ! $18.87M |
Open | High | Low | Value | Volume |
6.5¢ | 6.8¢ | 6.5¢ | $5.14K | 75.73K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 397646 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 59998 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.066 |
2 | 11967 | 0.065 |
2 | 80708 | 0.064 |
1 | 15873 | 0.063 |
1 | 22869 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 72020 | 1 |
0.069 | 59998 | 1 |
0.070 | 602176 | 1 |
0.071 | 150154 | 2 |
0.073 | 315000 | 1 |
Last trade - 12.17pm 29/05/2024 (20 minute delay) ? |
|
|||||
Last
6.8¢ |
  |
Change
0.004 ( 1.49 %) |
|||
Open | High | Low | Volume | ||
6.5¢ | 6.8¢ | 6.5¢ | 52322 | ||
Last updated 12.28pm 29/05/2024 ? |
Featured News
BAS (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online