HyQUOTE: Of course they can modify, but generally, they try to optimise the project for a particular outcome, this may be for lower Capex, higher NPV, lower opex etc.
Yes they can and do/ dit it. There´s nothing bad with it, WKT did it different than GPX
Hy Natos,
i am not THAT expert, neither can i articulate acurate in english to transport my knowlage from german to english. My thoughs are that because of a less capex and opex there are NOW different premises/ thoughts for the math of the NPV, comparing the PFS and the DFS. The DFS shows with a high propebility a higher NPV with half output over a longer LOM. Saying this, i haven´t simulated the DFS with the original numbers. I have not THAT time to proof everything in 100% detail for other´s.
For me i know everything i need.
Exciting times ahead, and shurely better times
- Forums
- ASX - By Stock
- Ann: Definitive Feasibility Study Update
Hy QUOTE: Of course they can modify, but generally, they try to...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MVL (ASX) to my watchlist
|
|||||
Last
0.7¢ |
Change
-0.001(12.5%) |
Mkt cap ! $6.047M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.7¢ | $806 | 115.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 250000 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 615124 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 250000 | 0.006 |
2 | 466833 | 0.005 |
2 | 900000 | 0.004 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 615124 | 2 |
0.010 | 888939 | 5 |
0.011 | 76765 | 1 |
0.012 | 45500 | 1 |
0.013 | 300000 | 1 |
Last trade - 15.14pm 28/06/2024 (20 minute delay) ? |
Featured News
MVL (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online