DRM 0.00% 33.0¢ demetallica limited

Ann: Deflector Mine Geology Update, page-34

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 21 Posts.
    lightbulb Created with Sketch. 11
    Wouldn’t 20g/t Au be great!

    For 20g/t Au dirt rather than 10g/t Au dirt, the mill would ideally run not at 50%, but at 100% capacity for 50% of the time – AKA “Campaign Milling”. There is always a cost to shutting down and starting up a mill in Campaign Milling, but the Operating Costs would be much lower on a per oz Au basis. The Fixed Costs would remain essentially the same, but be spread across a much higher Au production rate.

    Overall, much preferable to mill high grade dirt for a shorter time if it was available.
 
watchlist Created with Sketch. Add DRM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.