HI mark , all heavy machinery hates to sit idle regardless of the condition when shut down ,( when electrical circuits are off line they attract moisture) transfer pumps , conveyor and plant electric motor windings attract moisture ,bearings seize, corrosion/rust takes place every wear especially in the wet and high humidity , sediment residue sits in pipes , sumps etc and can be all most impossible to flush requiring full pipe work section change outs or strip down and recon , electrical distribution centre breakers switchboards circuits etc all have to be proven and hate moisture and can dead short on start up , many issues will confront production crews on initial start up .
When leaving electrical equipment , especially three phase power generation should have CONSTANT electrical circuit warming in place when idle in the wet season .
much can be prevented with good care and maint , but not all ,it all costs and the longer it sits the more likely you will have many start up issues .
- Forums
- ASX - By Stock
- Ann: Despatch of Letters to Shareholders
HI mark , all heavy machinery hates to sit idle regardless of...
Featured News
Add PRX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.001(20.0%) |
Mkt cap ! $6.353M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $300 | 100K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 10521362 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 21024699 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 10421362 | 0.002 |
25 | 94252098 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 21024699 | 18 |
0.004 | 9594859 | 11 |
0.005 | 4688264 | 9 |
0.006 | 2860001 | 6 |
0.007 | 600000 | 2 |
Last trade - 14.31pm 05/07/2024 (20 minute delay) ? |
Featured News
PRX (ASX) Chart |