CTP 10.0% 5.5¢ central petroleum limited

Ann: Developing Unconventional Gas Conference - CTP Presentation, page-5

  1. 6,303 Posts.
    lightbulb Created with Sketch. 2505
    You can find that information is in the presentations released by the company.

    The latest figures are 45 TJ/d for Mereenie, 6 TJ/d for Dingo (constrained by raw gas pipeline capacity so could be upgraded) and Palm Valley seems to around 7 TJ/d. But Palm Valley's constraint will be well availability, so I think with more drilling or workovers that could rise significantly.

    One presentation says the success of Palm Valley Deep would allow another 15 PJ/year production which is 40 TJ/d. So we're looking at approx. 60 TJ/d currently and up to 100 TJ/d should be achievable without any major upgrades required.

    I don't know what the theoretical oil capacity is but I don't think they are likely to reach that limit. We can probably safely assume Mereenie won't ever be constrained through not having enough oil capacity, since it's a low volume field and all they are doing is loading it into trucks and carting it away.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.