agree, there must be some catalyst to meet before the barge comes and picks up coal. Whether that be enough coal, stedy stream of coal avaialble so the barge is constantly booked, availability of barge, buyer of coal? Would be nice to know good or bad what the issue is here and to know when overcome if it is overcome permanntly or a constant issue. These phtos are the best we have seen. The commissioned trucks look brand new. An additional haulage contractor to appointed.
My question is, will there be 28 trucks plus those provided by the appointed contractor or does 28 include those to to be operated by the contractor?
- Forums
- ASX - By Stock
- Ann: Development of Infrastructure Supports Ramp-Up of Production
agree, there must be some catalyst to meet before the barge...
-
- There are more pages in this discussion • 136 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.2¢ |
Change
0.001(1.23%) |
Mkt cap ! $88.47M |
Open | High | Low | Value | Volume |
8.1¢ | 8.3¢ | 8.1¢ | $21.99K | 269.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 23900 | 8.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.4¢ | 395000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23900 | 0.082 |
2 | 109694 | 0.081 |
3 | 272144 | 0.080 |
1 | 100000 | 0.078 |
1 | 70200 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.084 | 395000 | 2 |
0.085 | 102083 | 2 |
0.086 | 50000 | 1 |
0.087 | 14207 | 1 |
0.090 | 110000 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
CKA (ASX) Chart |