There is no requirement to remove waste from the fine ore bin. The fine ore bin is a stockpile of crushed ore within the plant area. It has two purposes:
1) Enables the rod mill to receive ore when the crushing circuit is down for maintenance or lack of ore on the ROM pad. There is a opening at the base of the bin which a loader can take ore and feed into a hopper with a belt leading to the rod mill. In this case the ROM pad loader can do the job.
2) Enables the crushing circuit to operate when the rod mill is down for maintenance.
I cannot see why a second loader is required for the fine ore bin but a backup loader for the ROM is a good idea.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-1355
-
-
- There are more pages in this discussion • 4,961 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.005(4.55%) |
Mkt cap ! $77.19M |
Open | High | Low | Value | Volume |
11.5¢ | 11.5¢ | 11.5¢ | $15.77K | 137.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1088450 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 487997 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1088450 | 0.110 |
4 | 382988 | 0.105 |
15 | 713619 | 0.100 |
2 | 120000 | 0.099 |
1 | 130000 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 487997 | 11 |
0.125 | 762059 | 14 |
0.130 | 266789 | 7 |
0.135 | 458027 | 6 |
0.140 | 108000 | 2 |
Last trade - 16.10pm 01/07/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online