Hi SpareCash7,
In a way, I fill very sorry for that poster, who said the other day, that 11KV power was sufficient to turn the lights On.
As you are well aware, the HV switch yard is only metres away from the first MCC and there say it will not take, very long to run the cables and perform Insulation resistance test on the cables and turn the Power On.
In terms of the other MCC, it shouldn't take long to run the power cables, as the furthest MCC is probably 50 metres away.
Not long know till we are in production mode.
IMHO.
Regards
Rossi70
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
Hi SpareCash7,In a way, I fill very sorry for that poster, who...
- There are more pages in this discussion • 1,268 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
-0.005(3.85%) |
Mkt cap ! $83.90M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 12.5¢ | $10.71K | 83.23K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 69810 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 43105 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 69810 | 0.125 |
4 | 241071 | 0.120 |
4 | 195216 | 0.115 |
5 | 619818 | 0.110 |
7 | 319976 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 43105 | 2 |
0.135 | 420959 | 7 |
0.140 | 312924 | 2 |
0.145 | 108000 | 2 |
0.150 | 107272 | 3 |
Last trade - 15.58pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
12.5¢ |
  |
Change
-0.005 ( 3.85 %) |
|||
Open | High | Low | Volume | ||
12.8¢ | 12.8¢ | 12.5¢ | 8651 | ||
Last updated 15.24pm 03/05/2024 ? |
Featured News
WKT (ASX) Chart |