WKT 2.33% 10.5¢ walkabout resources ltd

Ann: Development Progress - Lindi Jumbo Mine, page-3922

  1. 15,924 Posts.
    lightbulb Created with Sketch. 6846
    Well done sparecash,

    you have finally worked it out that WKT needs to complete around 600test per month for the grade control. no visual grade control will be used.

    As you might understand with the narrow nature of the high-grade ore, WKT will need significant testing and this will also be critical for the blasting/spacing not to allow to much dilution of grade.

    Looking forward to seeing how the mining contractor goes with these narrow veins within the same host mineralisation.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.