Yes, WKT is still checking the operation, no ore is being passed through.
Didnt andrew claim he was confident WKT would produce graphite during Q1?
Why are these time frames constantly being missed? And why does the pump crew accept these failures?
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
Yes, WKT is still checking the operation, no ore is being passed...
-
- There are more pages in this discussion • 2,072 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
|
|||||
Last
11.0¢ |
Change
0.005(4.76%) |
Mkt cap ! $73.83M |
Open | High | Low | Value | Volume |
10.5¢ | 11.0¢ | 10.5¢ | $14.33K | 135.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 805636 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 249479 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.110 |
7 | 806588 | 0.105 |
14 | 738632 | 0.100 |
1 | 20000 | 0.099 |
1 | 100000 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 65886 | 1 |
0.110 | 265189 | 5 |
0.115 | 64000 | 3 |
0.120 | 515997 | 11 |
0.125 | 738059 | 13 |
Last trade - 16.10pm 25/06/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |