All the Motor Control Centres (MCC’s) for the plant have been shipped to site and will arrive in Tanzania in the coming days. The MCC’s are fully prefabricated and once delivered to site will be connected to the electrical circuits currently being installed.
This is not far off from powering up. It has been mentioned before that once this is installed and wired up the pre commissioning can be done for the electrical safety and equipment controls.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-42
-
- There are more pages in this discussion • 6,269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
|
|||||
Last
11.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $73.83M |
Open | High | Low | Value | Volume |
11.0¢ | 11.5¢ | 11.0¢ | $4.298K | 38.64K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 203451 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 230858 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 188451 | 0.110 |
5 | 632988 | 0.105 |
15 | 803519 | 0.100 |
1 | 20000 | 0.099 |
4 | 316500 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 47058 | 2 |
0.120 | 437997 | 10 |
0.125 | 688059 | 12 |
0.130 | 154444 | 5 |
0.135 | 408027 | 5 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online