Hi names little it’s not about wasting material…It’s about raising the grade to maximise potential
By raising the grade lowers the throughput to deliver 40,000 tpa
A 5%TGC simply implies that the plant capacity is reduced by 4 times the throughput…This would increase the CAPEX significantly for zero economic benefit…Then we have the extra costs associated with the TSF
Quite frankly the right size concepts have been chosen where the project potentially returns an IRR of 119% and then has a reserve stockpile with grade from 5-10% TGC free dig
You guys are trying hard to destroy credibility of the project but really have very little substance of support…
Regards Croc (Only quality projects can raise the cut off grade…)
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
Hi names little it’s not about wasting material…It’s about...
-
- There are more pages in this discussion • 3,111 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
Previous Video
Next Video
SPONSORED BY The Market Online