WKT 0.00% 10.5¢ walkabout resources ltd

Ann: Development Progress - Lindi Jumbo Mine, page-6043

  1. 2,275 Posts.
    lightbulb Created with Sketch. 919
    So Lindi Jumbo is now producing tonnes per hour Spid news. Lindi Jumbo was operating in a C4 commission on June 3rd where the plant was being fed 30+tph. It’s been 3 weeks since this was shown and the planned ramp up to 45tph. There’s no way ramp up to 45tph would take place if all other facets of the mine aren’t performing. Lindi Jumbo has to be producing 5-7 tonnes per hour. The question now is how much run time has been consistently made available. 10 hours is still 50 bags per day as @Stirer indicated was a possibility. Definitely not 9 in total as fake news continues running its negative agenda on the obvious success of Lindi Jumbo.


    https://hotcopper.com.au/data/attachments/6266/6266527-83a387ce08b433c64dfbf489f6fd500a.jpg

 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.5¢
Change
0.000(0.00%)
Mkt cap ! $70.48M
Open High Low Value Volume
10.5¢ 10.5¢ 10.5¢ $22.59K 215.1K

Buyers (Bids)

No. Vol. Price($)
17 697549 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 105110 2
View Market Depth
Last trade - 15.53pm 01/08/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.