Other than data cable I haven't seen and tweets from Mike showing electric power cables for the numerous electric motors in the plant. Each electric motor for conveyor belts, crushers, grinding mills, water and slurry pumps, air aspirarors, dryers, filters etc needs cable hard-wired and run via cable trays back to a starter box with earth leakage protection. Each starter box needs to be connected via cable to a distribution board (DB) and each DB needs to be connected via cable back to a step down transformer.
I cannot see dry commissioning (filling the fine ore bin) commencing this year. It's more likely towards the end of Q1 with wet commissioning in Q4.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-634
-
-
- There are more pages in this discussion • 5,780 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
|
|||||
Last
10.5¢ |
Change
-0.003(2.33%) |
Mkt cap ! $70.48M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 10.5¢ | $21.84K | 201.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 604881 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 224492 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 525791 | 0.105 |
10 | 537424 | 0.100 |
2 | 120000 | 0.099 |
1 | 130000 | 0.098 |
1 | 150000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 217628 | 5 |
0.115 | 990750 | 4 |
0.120 | 626697 | 11 |
0.125 | 447166 | 9 |
0.130 | 225598 | 4 |
Last trade - 12.11pm 12/07/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |