Why do you always get so confused Croc? I stated that the starter boxes needed earth leakage protection and you asked why and I explained why and now you ask about legislation.
Getting back to the enormous amount of electrical cabling and switch gear required to be installed when is it going to commence? If it is already underway where is Mike's tweet? What voltage motors are they using? 415V requires big heavy cable compared to 1000V.
Another thing Croc, before I graduated from WASM, I did work as a drillers offsider on an RC rig. Swinging 500 pound rods was hard yakka.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-643
-
-
- There are more pages in this discussion • 7,173 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
0.001(1.04%) |
Mkt cap ! $65.11M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.7¢ | $2.278K | 23.17K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 17728 | 9.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 48276 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 63820 | 0.096 |
6 | 192685 | 0.095 |
1 | 100000 | 0.094 |
5 | 291916 | 0.090 |
1 | 50000 | 0.085 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 48276 | 2 |
0.105 | 61460 | 3 |
0.110 | 509999 | 7 |
0.115 | 467312 | 8 |
0.120 | 427177 | 3 |
Last trade - 14.41pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
WKT (ASX) Chart |