The previous announcement did not include ether an intended or required date, nor any indication of what equipment is required or the anticipated lead times.Updating technical documentation might only take a couple of months but installation of monitoring equipment that you don't currently own could conceivably take a year. The permit was issued with ongoing work required, not denied until the works were completed, so I guess they are not urgent during commissioning.
It's not clear from that statement whether the additional monitoring relates to runoff water quality or to heap slump and risk of catastrophic failure of a pile of sludge that hasn't been built yet. I haven't looked for the government's permit conditions, have you?
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
The previous announcement did not include ether an intended or...
-
- There are more pages in this discussion • 1,825 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10516 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 2350 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10516 | 0.095 |
1 | 48723 | 0.094 |
1 | 38517 | 0.092 |
2 | 21878 | 0.090 |
3 | 58796 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 2350 | 1 |
0.096 | 37788 | 1 |
0.100 | 5000 | 1 |
0.105 | 55971 | 2 |
0.110 | 169999 | 3 |
Last trade - 16.16pm 08/11/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online