WKT 4.17% 9.2¢ walkabout resources ltd

It should be noted that no 2 Graphite project are the same…Each...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 8,671 Posts.
    lightbulb Created with Sketch. 7179
    It should be noted that no 2 Graphite project are the same…Each has its own unique resource and production methods…Not all Graphite is created equal with different characteristics different host rock materials and liberation of the Graphite from the host rock material.A project can be effected by different grade, strip ratio, host rock material, weathering or fresh material…

    The project is now well underway with many hours of testing, tweaking and minor improvements including optimising the burners to reduce fuel consumption…Tweets now confirming record tonnage from 2 shifts in sequence producing 72 bags within specifications

    Even now it appears that only 25-30% of plant is now being utilised as they ramp up production from early August…Exports have been confirmed…

    This is something SYR has never been able achieve and will continue to linger masking its design failures while value adding BAM materials…After several years SYR are yet to utilise 25% of its plant while Lindi has achieved this under 4 months of commissioning with minor repairs…Each improvement positions the plant to be ran at higher capacity rates…(It should be noted SYR graphite is embedded with vanadium contamination that needs to be removed while also requiring a higher level of purification for end use..Less grinding less processing. Lindi plant is designed for larger flake material to bypass grinding where possible…

    Similar improvements have been achieved by improving the testing period from on site Lab where adjustments can be made via the automated control panel and CCTV system.

    https://hotcopper.com.au/data/attachments/6405/6405701-61c5c1aff9371250a27ddd44789ba895.jpg

    The specification sheet demonstrates premium pricing lower level purity requirements for expandable and coatings and unique characteristics of superior expansion ratios…

    The project must be close enough to break even position with plenty of plant redundancy still to be utilised…

    Regards Croc

 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
9.2¢
Change
-0.004(4.17%)
Mkt cap ! $61.75M
Open High Low Value Volume
9.7¢ 9.7¢ 8.9¢ $45.75K 501.6K

Buyers (Bids)

No. Vol. Price($)
1 200000 9.3¢
 

Sellers (Offers)

Price($) Vol. No.
9.5¢ 5315 1
View Market Depth
Last trade - 12.53pm 01/11/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.