The TSF wall clearly has a new layer on top. Since this material is drawn from the overburden and other waste rock, I guess it's open to interpretation whether removing and hauling away that material is called "mining", "quarrying" or "excavation". It's removing stuff that doesn't yield graphite to make ti easier to access stuff which does. There are mining contractors who continue to be usefully employed, and they keep as much ore as required by the processing plant.
It's not clear from the photo where the actual process tailings have ended up or how they get from the plant to the TSF.
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
The TSF wall clearly has a new layer on top. Since this material...
-
- There are more pages in this discussion • 998 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10516 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 2350 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10516 | 0.095 |
1 | 48723 | 0.094 |
1 | 38517 | 0.092 |
2 | 21878 | 0.090 |
3 | 58796 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 2350 | 1 |
0.096 | 37788 | 1 |
0.100 | 5000 | 1 |
0.105 | 55971 | 2 |
0.110 | 169999 | 3 |
Last trade - 16.16pm 08/11/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online