WKT 4.17% 12.5¢ walkabout resources ltd

Not once the main 5MW transformer comes on line Spid. The...

  1. 1,876 Posts.
    lightbulb Created with Sketch. 813
    Not once the main 5MW transformer comes on line Spid. The generators may be required if running the crusher circuit at the same time as they are only required for backup. You lost your leverage on the generators once the main transformer turned up on site. HaHa. The crusher circuit has now produced enough material for the grinding and concentrator wet commissioning Spid. What more is required, Mike has just shown you water is now available, ore is prepared and the main transformer is nearing completion. So no Spid the generators aren’t required to run the mid section of Lindi Jumbo’s processing plant. Next piece of BS that needs debunking please.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
12.5¢
Change
0.005(4.17%)
Mkt cap ! $83.90M
Open High Low Value Volume
12.5¢ 12.5¢ 12.3¢ $63.33K 507.9K

Buyers (Bids)

No. Vol. Price($)
1 143748 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 356866 7
View Market Depth
Last trade - 14.19pm 21/05/2024 (20 minute delay) ?
Last
12.5¢
  Change
0.005 ( 4.17 %)
Open High Low Volume
12.3¢ 12.5¢ 12.0¢ 333355
Last updated 14.29pm 21/05/2024 ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.