Non holders have never claimed the primary crusher would not crush fresh rock. What has been said is that it will be a bottleneck because open pit blasted ore will contain a significant proportion of material greater than the grizzly opening of 500mm. Most published data on muckpile size distribution has 10 to 15 percent of fragments greater than 500mm. The existing fine ore stockpile has been generated without the pressure of production. It's too early to claim the crushing circuit a success - wait for production to begin and then assess over a 3 month period.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-4294
-
- There are more pages in this discussion • 1,320 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.0¢ |
Change
-0.005(4.00%) |
Mkt cap ! $80.55M |
Open | High | Low | Value | Volume |
12.0¢ | 12.0¢ | 12.0¢ | $59.27K | 493.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 354008 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 78848 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 344008 | 0.115 |
9 | 386590 | 0.110 |
9 | 249214 | 0.105 |
5 | 292922 | 0.100 |
2 | 120000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 78848 | 1 |
0.125 | 323514 | 6 |
0.130 | 451989 | 12 |
0.135 | 510959 | 8 |
0.140 | 150000 | 2 |
Last trade - 13.48pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
12.0¢ |
  |
Change
-0.005 ( 4.00 %) |
|||
Open | High | Low | Volume | ||
12.0¢ | 12.0¢ | 11.5¢ | 246704 | ||
Last updated 13.48pm 05/06/2024 ? |
Featured News
WKT (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online