WKT 0.00% 12.5¢ walkabout resources ltd

Hi spid81 we all know you tend to make stuff up and then post...

  1. 8,393 Posts.
    lightbulb Created with Sketch. 6900
    Hi spid81 we all know you tend to make stuff up and then post around that narrative...Not willing to except how wrong you have been on others' stocks

    Lets give this some substance...Where are the runaway costs going to come from...?

    2016 5% cut off - OPEX - USD $292 Per tonne
    2017 7.5% cut off - OPEX - USD $289 Per tonne
    2019 10% Cut off - OPEX - USD $282 Per Tonne

    Quality is a consideration in strip ratio.If a depositcontains low grade ore quality ore more of it must be mined in order to achievea return on investment. A higher grade deposit can support a higher stripratio. There is an inverse relationship between deposit grade and strip ratio.The higher the grade universally reduces the capex and Run of mine cost's

    The ore reserve is based on37% of the tons of the measured and indicated....

    Grade is more sensitive than stripratio....

    Grade TGC (15% )

    Strip Ratio 3.3:1

    ROM Per Ton unit Cost US$ 3.14

    Processing per Ton unit cost US$ 27.56

    General formula

    m x (r+1)/g + p/g

    Where m is mining cost, r is strip ratio, g is grade & p isprocessing cost



    Project A

    ROM mining cost per ton unit US$3.14 x (4.4+1)=$16.95 per ton Rom /17.9%= US$94.69

    Processing cost per ton unit US$27.56 / 17.9%= US$154

    ROM Ming cost US$94.69 + Processing cost US$154 = US$248.69

    1000 tons per day x 300 days x 17.9% x 90% recovery = 48,330tons

    Revenue US$73,944,900

    Mining and Processing cost ($248.69 x 48,330)= US$12,019,187

    EBITDA US$61,925,713

    Project B

    ROM mining cost perton unit US$3.14 x (4.4+1)=$16.95 per ton Rom /15% = US$113
    Processing cost per ton unit
    US$27.56 / 15 % = US$184
    ROM Ming cost US$113 + Processing cost
    US$184 = US$297
    1000 tons per day x300 days x 15% x 90% recovery = 40,000 tons
    Basket price US$1530
    Revenue US$61,200,000
    Mining and Processing cost (297 x 40,000)= US$11,880,000
    EBITDA US$49,320,000



    Regards Croc
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
12.5¢
Change
0.000(0.00%)
Mkt cap ! $83.90M
Open High Low Value Volume
12.5¢ 12.5¢ 12.5¢ $20.01K 160.0K

Buyers (Bids)

No. Vol. Price($)
1 1177 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 559778 15
View Market Depth
Last trade - 12.25pm 29/05/2024 (20 minute delay) ?
Last
12.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
12.5¢ 12.5¢ 12.5¢ 8521
Last updated 13.51pm 29/05/2024 ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.