During the tailings dam construction 19kt of graphite ore was unexpectedly discovered and stockpiled for processing and the company claimed it was ideal for plant feed. Now however, after realising the oversize won't fit through the grizzly it has changed its tune and agreed with my assessment that oversize will cause a bottleneck at the crusher which is undersized for fresh rock, particularly schist and gneiss.
- Forums
- ASX - By Stock
- Ann: Development Progress - Lindi Jumbo Mine
During the tailings dam construction 19kt of graphite ore was...
-
- There are more pages in this discussion • 1,864 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
-0.010(8.00%) |
Mkt cap ! $80.55M |
Open | High | Low | Value | Volume |
12.0¢ | 12.0¢ | 11.5¢ | $7.877K | 66.03K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 394553 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 439594 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 394553 | 0.115 |
7 | 366590 | 0.110 |
8 | 239214 | 0.105 |
6 | 392922 | 0.100 |
2 | 120000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 439594 | 8 |
0.130 | 451989 | 12 |
0.135 | 510959 | 8 |
0.140 | 150000 | 2 |
0.145 | 300000 | 4 |
Last trade - 12.16pm 06/06/2024 (20 minute delay) ? |
|
|||||
Last
11.5¢ |
  |
Change
-0.010 ( 4.17 %) |
|||
Open | High | Low | Volume | ||
12.0¢ | 12.0¢ | 11.5¢ | 60575 | ||
Last updated 12.54pm 06/06/2024 ? |
Featured News
WKT (ASX) Chart |