WKT 0.00% 9.6¢ walkabout resources ltd

Ann: Development progress - Lindi Jumbo project, page-1718

  1. 3,056 Posts.
    lightbulb Created with Sketch. 1147
    Yes Blitz, a fine ore bin is standard in a mine process plant. If there is any breakdown or preventative maintenance required in the crushing circuit the concentrator plant can still keep operating. Nonetheless, an undersized crusher, whilst it may have been low cost, represents a bottleneck.

    Perhaps the variable speed electric motors which drive the crushers and conveyor belts will be the solution? NOT. Who was it claiming the VSD motors were special when they have been standard for many decades?
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
9.6¢
Change
0.000(0.00%)
Mkt cap ! $65.11M
Open High Low Value Volume
9.7¢ 9.7¢ 9.6¢ $5.771K 59.79K

Buyers (Bids)

No. Vol. Price($)
2 2764 9.6¢
 

Sellers (Offers)

Price($) Vol. No.
9.7¢ 7907 2
View Market Depth
Last trade - 15.21pm 17/09/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.