WKT 4.76% 11.0¢ walkabout resources ltd

Ann: Development progress - Lindi Jumbo project, page-1747

  1. 2,205 Posts.
    lightbulb Created with Sketch. 903
    HaHa Spid81. They won’t be mining straight along the drill holes dopey. A parallel between high grade drill holes results of 7m to 9m depths of high grade ore to be mined. At 800m long roughly the size of Lindi’s proposed pit that would equate to around 70 day’s full production assuming it’s a 10m vein. Those veins aren’t so tiny now are they Spid. The pit is expected to finish at 100m deep chasing those narrow veins of yours Spid. An 800m long 100m deep vein at 10m ain’t tiny Spid. Honestly, stop trying to mislead. Each of these layers are also as Farmdownsouth has suggested, they are layered sheets of graphite contained in schist or basically slate. Made that way by nature so each layer will easily be defined visually as quoted by management. Run the numbers, a 10m vein, 800m long and 100m deep is enough feedstock to run Lindi’s plant for more than 3 years. Not tiny or narrow as the nefarious ones say at all.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
11.0¢
Change
0.005(4.76%)
Mkt cap ! $73.83M
Open High Low Value Volume
10.5¢ 11.0¢ 10.5¢ $78.27K 743.2K

Buyers (Bids)

No. Vol. Price($)
2 100526 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 289158 9
View Market Depth
Last trade - 16.10pm 15/07/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.