WKT 2.33% 10.5¢ walkabout resources ltd

Ann: Development progress - Lindi Jumbo project, page-1756

  1. 15,927 Posts.
    lightbulb Created with Sketch. 6849
    As you can see in the image below, out of the 53m of defined resources (schist), only 3m above the 17.9% TGC Grade.
    I get the impression you are expecting all of the different TGC grades, to be shown in layered like a kids rainbow cake. Just like the image below has broken it up into different colours
    How dumb do you think investors are to believe you BS?


    https://hotcopper.com.au/data/attachments/5513/5513630-9d5480f57f620eae85dfac11de361f1f.jpg


    @Stirer WKT"s JORC was based on a drill spacing of 35-150m.

    https://hotcopper.com.au/data/attachments/5513/5513637-ea575319ec82829f9cb1cdd5d2581e55.jpg
    https://www.asx.com.au/asx/statistics/displayAnnouncement.do?display=pdf&idsId=02061501


    As you can see by all of the colours in the image above, there is enough variability within RC Drill LJROC48, none of the drill results were within WKT's average grade of 17.9% TGC.




 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.