And a note on exploration strategy.. If they're feeling really optimistic and have no better options the relatively high heat-flow could justify a 3 km hole to look for permeable units and faults and check temperature. If the heat flow modelling was accurate that should get them to 150 C. A initial seismic survey should be done to check the thickness of the basin (if it's only 1.5 km then don't bother) and if there any major faults associated with surface hot springs. However I'd also want taxpayers to chip in a large part of the exploration cost as well.
- Forums
- ASX - By Stock
- Ann: Development Roadmap for Queensland Projects
And a note on exploration strategy.. If they're feeling really...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
-0.002(8.33%) |
Mkt cap ! $10.09M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.2¢ | $533 | 21.15K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 43478 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 141833 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 43478 | 0.023 |
3 | 64597 | 0.022 |
2 | 186000 | 0.021 |
1 | 100 | 0.020 |
1 | 55000 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 141833 | 2 |
0.029 | 199043 | 3 |
0.030 | 206056 | 1 |
0.034 | 500000 | 1 |
0.035 | 2445501 | 3 |
Last trade - 10.24am 09/09/2024 (20 minute delay) ? |
Featured News
GRV (ASX) Chart |