SYA 5.71% 3.3¢ sayona mining limited

i see all the positivesDefinitive feasibility study estimates...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 245 Posts.
    lightbulb Created with Sketch. 38
    i see all the positives

    Definitive feasibility study estimates A$2.2B (C$2B) (C$1 = A$1.11) pre‐tax net present value (NPV)
    (8% discount) for spodumene concentrate produced from combined North American Lithium (NAL)
    and Authier Lithium Project, demonstrating Abitibi lithium hub’s long‐term financial and technical
    viability
     Revisions to mineral resources and ore reserves improved head grade, recovery and total production,
    driving enhanced NPV compared with 2022 Pre‐Feasibility Study (PFS) outcomes
     Production target increased to life‐of‐mine (LOM) average 190,000t annual concentrate production,
    supporting after‐tax IRR of 2,545%; total net revenue of around A$7.6B and project EBITDA of A$3.7B;
    NAL production capacity of 226,000 tonnes per annum (tpa) for next four years until start of
    downstream operations
     Low‐risk operation set to become leading North American source of hard rock lithium production,
    powering North America’s battery and EV revolution.
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
-0.002(5.71%)
Mkt cap ! $339.6M
Open High Low Value Volume
3.5¢ 3.6¢ 3.3¢ $1.707M 49.50M

Buyers (Bids)

No. Vol. Price($)
41 9042151 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 1735970 10
View Market Depth
Last trade - 16.10pm 01/10/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.