FBM 0.00% 5.0¢ future battery minerals limited

Ann: DHEM IDENTIFIES DRILL TARGET AT THE VALDEZ NICKEL PROSPECT, page-3

  1. 2,734 Posts.
    lightbulb Created with Sketch. 1062
    Encouraging announcement this morning.

    Auroch Managing Director Aidan Platel commented:

    “The Auroch team is very excited by this DHEM result. Given the proximity of Valdez to Saracen’s (ASX:SAR)
    Waterloo high-grade nickel sulphide deposit, the Company has always believed that a systematic
    exploration strategy at Valdez has the potential to discover significant nickel sulphide mineralisation.
    We
    utilised first the historic magnetics and surface EM work to get us in the right area, and then narrowed in
    on the main channel zone via air-core drilling and the subsequent deep RC programme.

    This exploration strategy and use of DHEM has proven successful at the Company’s Saints Nickel Project
    in targeting and drilling massive nickel sulphides, and we have recently seen other nickel sulphide
    discoveries in WA identified by our peers using DHEM.

    This strong DHEM conductor at Valdez now presents a high-priority drill target that we are eager to test
    with a diamond drill programme in November.”

    The DHEM surveys were conducted following the completion of a 1,500m RC drill programme. The
    purpose of the deep programme was to further test the Valdez Prospect following encouraging air-core
    (AC) results. A litho-geochemical review of the AC results showed elevated Ni and MgO within a modelled
    embayment along an ultramafic-basalt contact representing a potential komatiite channel. The channel
    target was coincident to an anomalous magnetic high and a historic surface EM conductor with a strike
    length of 1.2km, all of which are very encouraging signs for massive nickel sulphide mineralisation.

    A diamond drill programme has been planned to test the high priority DHEM target. Drilling is expected
    to commence early November following resource drilling at the Horn. Assay and DHEM results are also
    pending for the Firefly and North Sinclair Prospects.

    Ongoing work for the company includes a tightly run set of programmes across both the Saints and
    Leinster Nickel Projects. RC drilling is expected to commence shortly at the T1 target at Saints, which is
    located approximately 30km west of Estrella Resources (ASX:ESR) recent discovery at Carr Boyd. Diamond
    drilling will commence later this month at the Company’s Horn nickel sulphide deposit, aiming to upgrade
    the historic resource estimate to JORC (2012) -compliant. Further AC drilling of less-advanced prospects
    across the Saints and Leinster Nickel Projects is ongoing.


 
watchlist Created with Sketch. Add FBM (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $31.93M
Open High Low Value Volume
5.0¢ 5.0¢ 5.0¢ $2.147K 42.94K

Buyers (Bids)

No. Vol. Price($)
1 1291 5.0¢
 

Sellers (Offers)

Price($) Vol. No.
5.1¢ 46309 2
View Market Depth
Last trade - 10.28am 01/05/2024 (20 minute delay) ?
FBM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.