Real Energy prepares for next stage in Windorah gas development
By Danica Cullinane -
July 9, 2018
Real Energy managing director Scott Brown said the injection testing marked the completion of another key operational step at the Windorah gas project, which is aiming to develop an estimated 13.7 trillion cubic feet of gas-in-place resources to supply Australia’s east coast market.
“We are on track with our works program and rapidly advancing towards the much anticipated production phase,” he said.
“The excellent gas readings and consistent log interpreted gas pays so far for Tamarama-2 and Tamarama-3 give us confidence that fracture stimulation will deliver a positive result,” Brown added
Continued:
*********.com.au/real-energy-ready-commence-fracking-windorah-gas-project/
- Forums
- ASX - By Stock
- Ann: Diagnostic Fracture Injection Test Completed on Tamarama-3
Real Energy prepares for next stage in Windorah gas development...
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)