Sydney, 9 July 2018: Cooper Basin focused oil & gas exploration company Real Energy Corporation Limited (ASX: RLE) ("Real Energy") is pleased to report that operations are continuing at the Windorah Gas Project in the Cooper Basin with Diagnostic Fracture Injection Test work (DFIT) completed on the Tamarama-3 well.
The DFIT program was performed successfully. The Company confirms that the data from the test appears to be consistent with pre-drill assessments. The purpose of the DFIT is to derive stress and reservoir parameters for fine tune or optimise the fracture stimulation design and completion. Frac Modelling is now being conducted and the results will be reported next week and Fracture stimulation operations will commence later this quarter.
- Forums
- ASX - By Stock
- RLE
- Ann: Diagnostic Fracture Injection Test Completed on Tamarama-3
Ann: Diagnostic Fracture Injection Test Completed on Tamarama-3, page-2
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)